Screening and valuing local flexibility as a non-wires alternative: a topology-, contingency-, and resource-deliverability framework under Lithuanian distribution regulation |
| Authors |
Šimkonienė, Gintvilė ; Mikalauskas, Ignas |
| DOI |
10.3390/su182110726 |
| Full Text |
|
| Is Part of |
Sustainability.. Basel : MDPI. 2026, vol. 18, iss. 21, art. no. 10726, p. [1-28].. eISSN 2071-1050 |
| Keywords [eng] |
local flexibility ; non-wires alternatives ; distribution network reconfiguration ; contingency analysis ; resource deliverability ; demand response ; battery energy storage ; investment deferral ; Lithuania |
| Abstract [eng] |
Distribution flexibility can be overvalued when priced before network-side alternatives and resource deliverability are screened. This study develops a three-gate appraisal framework for local flexibility as a non-wires alternative (NWA): network incrementality, resource deliverability, and conditional economic value. The framework is demonstrated on the IEEE 33-bus benchmark using the observed Lithuanian 2025 hourly load shape and the 2026 Energy Distribution Operator (DSO) flexibility product as well as the Lithuanian National Energy Regulatory Council (VERT) context; it is not an actual Lithuanian feeder model. At the year-3 stress point, the normal topology violates the 0.95 p.u. analytical threshold, but the screened connected-radial topology space contains a compliant configuration, so paid flexibility has no incremental value in that benchmark state if an equivalent configuration is operationally permissible. In contrast, the Zone-C L22 contingency remains non-compliant after topology-only screening and leaves a 222.1 kW local residual requirement at buses 23–24. With a 20% controllable-demand bound, 106.1 kW of firm injection remains necessary, showing that an electrical support requirement may map to demand response, firm injection, or a hybrid portfolio. Economic eligibility then depends on the genuinely deferrable share of reinforcement. The contribution is the ordered stopping logic that separates electrical need, physical deliverability, and attributable economic value. |